Charlotte County, FL Logo

941.743.1200
18500 Murdock Circle
Port Charlotte, FL 33948

Mobile Menu close icon
接近搜索

项目状态 Updates

公共工程 Ian Projects

Hurricane Ian Projects

Learn about the ongoing 公共工程 and 设施 repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.

威廉R. 盖恩斯小. Veterans Memorial Park

威廉R. 盖恩斯小. Veterans Memorial Park 销售税项目

Last Updated: 09/13/2024 Category: 公园 And 娱乐 Category: 已缴纳的销售税 当前阶段: Planning and Project Approval

Design and construction of upland and wetland trails throughout 威廉R. 盖恩斯小. Veterans Memorial park.

阅读更多

Buena Vista Waterways Dredging Project

Buena Vista Waterways Dredging Project

Last Updated: 09/12/2024 类别:沿海 当前阶段: 建设

The Buena Vista Waterway Committee requested and received a dredging of the access and connector channels in 2016. 从那时起, new concerns of a need to restore safe navigation have been brought to the County’s attention.

阅读更多

Flamingo/Edgewater Widening 欧博体育官网 Image

Flamingo/Edgewater Widening 销售税项目

Last Updated: 09/12/2024 类别:巷道 当前阶段: Planning and Project Approval

Flamingo/Edgewater Widening

阅读更多

Placida West Boat Ramp Expansion 欧博体育官网 Image

Placida West Boat Ramp Expansion 销售税项目

Last Updated: 09/12/2024 Category: 公园 And 娱乐 Category: 已缴纳的销售税 当前阶段: 设计开发

A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak发射, 厕所, 和停车.

阅读更多

Bermont 路 Box Culverts Rehabilitations -路 and Bridge FY24

Bermont 路 Box Culverts Rehabilitations -路 and Bridge FY24

Last Updated: 09/11/2024 类别:桥梁 当前阶段: 设计开发

路 and Bridge FY24 Bridge Rehabilitations Bermont 路 - #010003, #010016, #010017, #010020

阅读更多

Canal Sediment Removal

Canal Sediment Removal

Last Updated: 09/11/2024 类别:排水 当前阶段: 设计开发

Charlotte County Engineering is proposing to design and implement a canal maintenance program to include dredging the upland freshwater canals to help improve the water quality of the waterways.

阅读更多

Sheriff District 4 HQ, Training Facility and K9 Unit 欧博体育官网 Image

Sheriff District 4 HQ, Training Facility and K9 Unit 销售税项目

Last Updated: 09/11/2024 Category: 县设施 Category: 已缴纳的销售税 当前阶段: 建设

建设 of a replacement District 4 Headquarters Facility with a training component and K9 kennel/training area replacing existing facilites. The district office will utilize the prototype layout from District 1. The training building area will be incorporated into a single facility. The facility will be constructed at the Airport 路 Annex site, replacing the existing Sheriff's Training, Supervisor of Election and old Transit Facility .

阅读更多

Cape Haze Wastewater Expansion

Cape Haze Wastewater Expansion

Last Updated: 09/10/2024 类别:公用事业 类别:公用事业 当前阶段: 完整的

阅读更多

Sheriff 政府 and Hardened 911 Facility 欧博体育官网 Image

Sheriff 政府 and Hardened 911 Facility 销售税项目

Last Updated: 09/10/2024 Category: 已缴纳的销售税 Category: 县设施 当前阶段: Planning and Project Approval

Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurrican Charley which is still suseptible to hurrican damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be colocated in the same facility.

阅读更多

Delivering Exceptional Service

问题? 问题?

欧博体育